Wednesday, March 4, 2020

Schedule + Labels

Half Way Point

So now that we are half way through our project, we thought it was necessary to make a schedule. With only 4 weeks left and so much to do, we don't want to fall behind. With a busy schedule, spring break, and school going on at the same time, we need to have a set plan. So we currently have finally set a film date/ time (FINALLY!) and estimated schedule for the editing.


The Schedule

03/04 to 03/14: Finalize the props and costume design. Finish making the props and placing everything in the car. Making sure the costume looks accurate and buy/ borrow anything if necessary.

3/15: Day of filming. Start around 1pm until filming is done. Hopefully only one filming day so that the costume and set design looks the same throughout the film opening.

03/16 to 03/29: Start and finish editing. Here we will need to find some music, titles, sounds, and so on. We also need to sort through all the footage and edit.

03/30 to 04/05: Complete the CCR and do the last touches. We hope to be done with editing as well.

Production Label

Although having a production label was not necessary, my teammate and I wanted to create our own to add into the opener. We believe this will make the credits look more authentic while also giving credit to both my teammate and I. We may decide to add more onto the the logo, however, we have already finalized our "production company name." We want to name the "company" BS productions playing on the fact that my last name is Boyarsky  while my teammate's is Schenquerman. Ironically it also sound like a curse word one uses to call something out for being fake.

Our Production Company Logo

No comments:

Post a Comment